ADUFee.com
Last reviewed 2026-05-31Medium confidence

McAllen ADU Permit Fees & Cost Calculator

McAllen’s official fee schedule shows a residential building permit minimum fee of $48 plus $0.16 per square foot, and a park development fee of $700 per unit. The available city documents do not clearly isolate a separate ADU-specific fee schedule, so ADUs likely fall under the city’s general residential permit and development fees, but this must be verified with the City of McAllen permitting office.

ADUFee.com is not affiliated with McAllen. Estimates are informational and should be verified with the city, utility providers, and qualified professionals.

Free ADU fee calculator

Estimate local ADU fees

Low confidence

Step 1 of 5: Location

The calculator uses staged city data from the ADUFee database with visible confidence levels and dated source tracking.

Fee overview

The available official documents do not clearly state an ADU-specific fee schedule for McAllen.

The park development fee may or may not apply to ADUs; confirmation from the City of McAllen is recommended before estimating total project fees.

Plan review and inspection amounts are incomplete in the search results, so final permit cost cannot be calculated reliably from the provided materials.

An ADU in McAllen is likely reviewed under the city’s general residential permit framework unless the permitting office applies a separate accessory structure classification.

The fee schedule excerpted in search results may be incomplete, so some charges may exist but were not visible in the provided text.

McAllen fee estimates should be verified against the current city, utility, and school district fee schedules before filing.

FAQs

Are McAllen ADU fee estimates official?

No. ADUFee.com provides planning estimates only. Final fees are set by the city, utility providers, school district, and other agencies.

What sources are used for McAllen?

The database stores city, state, utility, school, county, and other source links where available. Each estimate should still be verified locally.

Can ADU fees vary within Texas?

Yes. Permit, utility, school, inspection, and impact fees can vary by jurisdiction, parcel, project size, utility provider, and local interpretation.